Bowling Green Family Aquatic Center
Date
2013
Location
Bowling Green, Ohio
The City of Bowling Green, Ohio, hired BCI to prepare a Master Plan in 2008. A Bond Levy was held in 2011, and BCI assisted with the preparation of a campaign plan plus campaign graphics. The issue passed by a 60-40 margin and design began immediately. Construction began in June 2012 and was completed the following year.